MG should have investments of $2.5 bn in transmission, says EPE

With the high attractiveness for the implementation of photovoltaic plant projects in the northern region of the state of Minas Gerais, EPE recommends that R$ 13.3 billion ($2.5 bn) be invested in transmission by 2031 to expand the energy flow capacity of the National Interconnected System (SIN) from the northern part of Minas Gerais to the main load centres in the southeast region.

Source: Energia Hoje