Aneel releases 35 MW of wind power in Bahia

The National Electrical Energy Agency has authorised the start of test operation of the generating units UG 1 to UG 8 of EOL Corrupião 2, which have a total capacity of 18.8 MW. The plant is in the city of Pindaí, in Bahia. In the same city EOL Inhambú 2 also had 16.45 MW released for testing in the turbines UG1 to UG7.

Source: Canal Energia